Quote:
Originally Posted by Ivan Ivanov
The old sarcophagus will now be dismantled inside.
|
The new sarcophagus has a crane system built into the roof to facilitate the dismantling process of the old sarcophagus along with eventually getting at the remains of the reactor. The new containment also is sealed against points of the building to maintain humidity in the structure to slow the degradation of the compromised structure.